April 30, 2012

Reinforced Joist Structure

Changed vertical joist structure to add stability.

Reinforced Piling Structure

Added reinforcements to the pilings to stabilize the structure.

December 12, 2011

Updated View of Piling Placement


The pilings have been placed along the outside of the piers and will be attached with piling hoops.

November 23, 2011

Joist and Footing Addition

(Bottom view)
The decking now consists of each board that will be placed exactly 3/8" apart. The joists have all been added to the drawing, as well as footings and caps for the pilings.

October 06, 2011

Approximate Bulkhead Placement

The bulkhead will be placed approximately in this position. The final placement will correspond with the shape of the land more precisely.

October 05, 2011

Approximate Water Depth Chart

This chart displays the approximate water depths according to a chart constructed by the National Park Service.