Scope of the Project: My Role
Sandy Hook, NJ is a hot spot for tourism during the warmer seasons. It's a popular area for its beaches, bike paths, and fishing spots. Fishermen generally fish off the shore near the bay and the ocean at Sandy Hook. The National Park Service takes care of the maintenance and regulations around Sandy Hook. However, as of now, there are no designated areas for recreational or professional fishing. This limits the fishermen to fishing off the beach, which can be a hazard to people around them.
![]() |
| Figure 1- Sandy Hook bay area |
Currently, there is a chapel on the coast overlooking the bay, shown in Figure 1. This chapel is backed by a destroyed timber bulkhead, eroded land, and disorderly overgrown plant life. This bulkhead, shown in Figure 2, was supposed to stop the land from becoming so eroded, but it failure caused the land to become more eroded than ever. This gives a very limited area for visitors to the chapel to relax outside. This area of Sandy Hook needs a spot where fishermen can safely fish and visitors can relax, and also a sturdy bulkhead to prevent further erosion.
![]() |
| Figure 2- The current failed bulkhead |
My role in the Green Pier project is to design piers for professional and recreational fishermen and visitors, and design a sturdy bulkhead to protect the land from erosion. The piers will attach to the promenade behind them. The bulkhead will extend across the land underneath the promenade. The piers will operate with the promenade from May until September. To promote environmental friendliness, the entire area will be designed using green materials.
This project is hypothetical. This assignment gave the group an area to design as a theoretical situation. Every step up to construction, including layouts, plans, and contacts to officials have been completed. No physical products will come from the project, other than models of the layout. The project is based off learning about green materials and eco-friendly variables in real world situations.
This project is hypothetical. This assignment gave the group an area to design as a theoretical situation. Every step up to construction, including layouts, plans, and contacts to officials have been completed. No physical products will come from the project, other than models of the layout. The project is based off learning about green materials and eco-friendly variables in real world situations.

