BD Green Pier- Piers

October 06, 2011

Approximate Bulkhead Placement

The bulkhead will be placed approximately in this position. The final placement will correspond with the shape of the land more precisely.
Posted by BD at 10/06/2011
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: AutoCAD, Developmental Work
Newer Post Older Post Home

Blog Archive

  • ►  2012 (13)
    • ►  May (3)
    • ►  April (2)
    • ►  January (8)
  • ▼  2011 (54)
    • ►  December (13)
    • ►  November (8)
    • ▼  October (14)
      • Log 13
      • Log 12
      • Research on Trex Deck
      • Log 11
      • Research on American Plastic Lumber
      • Research on Connect-A-Dock
      • Log 10
      • Log 9
      • Log 8
      • Approximate Bulkhead Placement
      • Approximate Water Depth Chart
      • Research for Installing Posts in the Water for a Pier
      • Log 7
      • Preliminary AutoCAD Dock Design
    • ►  September (19)

Labels

  • AutoCAD (12)
  • Background Information (1)
  • Design Brief (2)
  • Developmental Work (3)
  • Materials (3)
  • MP 1 Log (13)
  • MP 2 Log (14)
  • MP 3 Log (1)
  • Press Release (1)
  • Research (8)
  • Self and Design Evaluation (1)
  • Solutions (4)
  • Specifications and Limitations (3)
  • Testing Procedures (3)

Search This Blog

Related Blogs

  • Green Pier-Architecture
    FPU Presentation, MP3
    13 years ago
  • Green Pier-Civil Engineering
    Model
    13 years ago

Subscribe To

Posts
Atom
Posts
Comments
Atom
Comments
Simple theme. Powered by Blogger.