BD Green Pier- Piers
November 23, 2011
Joist and Footing Addition
(Bottom view)
The decking now consists of each board that will be placed exactly 3/8" apart. The joists have all been added to the drawing, as well as footings and caps for the pilings.
Newer Post
Older Post
Home